News
Important information
Welding systems for Kiel

Hövelmann + Böckenholt transported the main part of a welding system at 5.80 m from Münsterland to Kiel.
Despite the large width and a total weight of 95 tons. The transport drove to the shipyard in Kiel in two nights as planned. A no-parking zone and an additional team to clear two construction sites in Kiel ensure everything runs smoothly on the second night.
Container tops for worms

The specialists from Hövelmann+Böckenholt transported these container tops from the customer to the port for a chemical plant in Oberhausen. With a height of 7.50 m and a width of 7.70 m, this is not an everyday transport even for professionals. In the port, the components were lifted into the inland vessel using a mobile crane and then they went across the canal and the Rhine to Worms. Hövelmann+Böckenholt was responsible for the entire logistics to Worms.
Mirror for a telescope in Chile

Hövelmann+Böckenholt brought the telescope housing to a port on the Rhine last year. In the fall, the two mirrors, up to 7.70 m wide and 5.00 m high, were brought from the Hövelmann heavy-lift warehouse to the port on the Rhine. The experts from Hövelmann+Böckenholt not only planned and carried out the transport but also the packaging of the huge, sensitive components.